ENGINEERING AND ASSEMBLY

esp / eng
07/10/2010
PROYECTO REPSOL-PETRONOR MUSKIZ-
CPI is just finishing the manufacture of all equipment related to the -Dry Fog- Dust Suppression System in Repsol\'s Muskiz Refinery.

The installation takes care of discharge, crushing, transport and stocking processes on the brand new fuel-oil reducing plant ADI-1000-AL6.

Solenoid Valves box with ATEX EExd operators
16/12/2009
Last Instalation manufactured by CPI
Uni??? Trans M???vil, SLL

Required to CPI for its brand new R&D (Recycle & Debris) treatment Plant a CPI\\\'s turn key dust suppression installation and also an automated irrigation system for their stockpiles and tracks that also coud be remote actuated (RF).

The installation was turned on last december with full satisfaction from client.

CPI\'s Dust Suppression System control panel
16/12/2009
CPI\'s installation ampliatio for ECALSA
ECALSA, Canteras Alavesas, S.A, a company belonging to the group SAINSA has requested an extension of the CPI\'s system to reduce dust emissions from existing systems to incorporate it in the new line of secondary crushing and classification.

Ecalsa's Prymary Crushing

INTRODUTION | COMPROMISE | CPI SYSTEM | FIELDS OF ACTIVITY | ENGINEERING AND ASSEMBLY | INSTALLATIONS MADE | CONTACT

Control del Polvo Ingeniería, S.L. (CPI) Pl. de la Llibertat, 1-3, escalera 2ª, piso 3º - 43201 Reus (Tarragona)
Tel. 902 737 002 - Fax 902 737 003 deptecnico@cpingenieria.com


disseny: Nimia.net